Past few weeks
In recent weeks i have done a variety of jobs. I have practised laying bricks. That was allright but the mortar was bad, and the bricks did not stick so well. I have helped Leevi with the fence. Leevi has sawn some timber and i bundled them together. At nine o'clock morning coffee is still in.
torstai 15. helmikuuta 2018
työpäiväkirja viime kuukausilta (eng)
During the last couple of months i have done a variety of jobs. First of all a door was made. We made it with Roope, in the work progress we did couple of mistakes and it took a while. We made the frames on the door and also installed the hinges.
Later with Niklas we put laminated flooring and, in my opinion it was nice and easy. In the same working place, we had to do and install the lists in the vestibule. For a good job we were rewarded with coffee!
I was also putting wallpaper on the wall. It was such a job that I did not succeed very well.
There are two types of wallpapers: non wowen and normal wallpaper. Difference hides in the wallpaper paste, non wowen wallpaper needs paste straight onto wall and normal wallpaper need paste onto paper itself.
At this week i have tiled onto training wall. In my opinion it is easy.
Later with Niklas we put laminated flooring and, in my opinion it was nice and easy. In the same working place, we had to do and install the lists in the vestibule. For a good job we were rewarded with coffee!
I was also putting wallpaper on the wall. It was such a job that I did not succeed very well.
There are two types of wallpapers: non wowen and normal wallpaper. Difference hides in the wallpaper paste, non wowen wallpaper needs paste straight onto wall and normal wallpaper need paste onto paper itself.
At this week i have tiled onto training wall. In my opinion it is easy.
keskiviikko 14. helmikuuta 2018
on-the-job learning at home (autumn)
I worked at home. It was nice.
I painted a plinth from our house, window frames, ladder and rooftrusses.
I also made a warm storage space.
First, i made the frame structure. I started from the lower reaches, then uprights and finally upper reaches. When the frame structure was ready, i placed plasterboards onto inside. After that i put wool over there.
A lot of coffee had to be drunk during working days.
There was a brief review of my on-the-job learning session.
I painted a plinth from our house, window frames, ladder and rooftrusses.
I also made a warm storage space.
First, i made the frame structure. I started from the lower reaches, then uprights and finally upper reaches. When the frame structure was ready, i placed plasterboards onto inside. After that i put wool over there.
A lot of coffee had to be drunk during working days.